Phase 1 · Built
Khanke floating intake
3,400 m³/h
Pumping capacity
- Built by
- Lavand Company and Doski Group
- On the shore
- 1,000 m³ pre-sedimentation tank
- Status
- In operation since 19 April 2026
General contracting, construction and infrastructure across Kurdistan and Iraq, from design through implementation.
Kurdistan and Iraq
Since 2014.
Since 2014, Lavand has delivered construction, renovation and infrastructure projects across Kurdistan and Iraq, with a specialty in the intakes, treatment plants and networks that bring clean water to cities, villages and camps.
Lavand Construction Co., Ltd.
By the numbers
Featured project · In operation
A floating water intake on the Mosul Dam Lake, 24 km from Duhok, reached by a 260 m floating concrete bridge. Designed and built by Lavand, it keeps pumping drinking water across a 52.75 m rise and fall of the lake.
Pouring the platform deck.
Why it floats
Khanke is the natural place to draw water for Duhok and the Semel district: clean Tigris water, close to the towns it serves. It is also one of the hardest shores in the region to build on. The soil is gypsum and slides, and the lake rises and falls by more than fifty metres between seasons.
Then the Mosul Dam turned the river into a lake. The gypsum soil slid, and the towers were lost.
One for low water and one for high. The lake moves too far: when it falls the high one is dry, and when it rises the low one is under water.
This shore, much closer to the city, was abandoned.
Float on it.
How it works
The bridge is 260 m of floating concrete, jointed block by block. As the lake falls, the blocks lie down on the slope; as it rises, they float out. The pumps keep working the whole way, from 280.00 to 332.75 m above sea level.
Four pumps of 850 m³/h on a 24 × 13.5 m concrete platform at the end of the bridge, automated and monitored remotely.
Jointed concrete blocks, 260 × 4 × 1 m in all, carry the pipeline to the shore and follow the water up and down the slope.
The bridge starts in a floodable chamber 2.75 m above the spillway, so it works even when the dam is full. A 1,000 m³ pre-sedimentation tank takes the first pass at the raw water.
Khanke in numbers
Floating intakes are usually designed for much smaller changes in water level. Khanke was designed for the whole lake.
The project team
100% local teams
Recognition
Two titles are accepted and their applications activated. The third is a new title, now with the Records Team.
Guinness World Records · Landmarks and Infrastructure
The Semel Water Project
Khanke is Phase 1 of a bigger scheme. From the lake, the water goes through the intake and pre-sedimentation to a treatment plant, reservoirs, nine towns and the west of Duhok.
Phase 1 · Built
3,400 m³/h
Pumping capacity
Phase 2 · Designed
5,000 m³/h
Treatment capacity
Lavand's design package for Phase 2 covers the architectural design, 3D visualisation and animation, the Gantt programme, the bill of quantities and the final report.
About 232,000 people live in the area the plant serves. By 2040 that passes 383,000, so the plant is designed for 5,000 m³ an hour: 100,000 m³ a day, at 250 litres per person per day, losses included.
Nine towns, and the west of Duhok
Phase 2 · The plant
Six steps take the lake water to drinking quality, at up to 5,000 m³ an hour.
6 pumps of 850 m³/h, 100 m head.
A 1,080 m³ inlet tank and two waterfalls.
4 mixing and 8 stabilisation tanks.
4 units, removing 85% of the solids.
8 filters, with air and water backwash.
A 5,000 m³ reservoir, pumped on to the towns.
Made on site from salt, and dosed at two points: after aeration and into the clear water tank.
The plant keeps treating the raw water even when winter storms make the lake turbid.
Flow meters at every tank inlet and outlet, with level and pressure monitoring.
Pumped from the plant at 375 m up to reservoirs as high as 650 m above sea level, then by gravity into the town networks. From Semel it climbs on to Kevela, the highest point, and to Tanahi.
375 m650 m
From the plant to the highest reservoir
Batufa water project
Batufa sits high in the hills north of Duhok, a long way above the river that supplies it. The scheme is one line: water is taken from the river, treated beside it, and pumped up the valley to the town, about 350 m higher.
On the river, at about 640 m above sea level, where the line begins.
About 420 m along the line and 39 m higher: the water is settled, filtered and made fit to drink before it travels.
About 2.6 km on, at about 767 m: the water is lifted again for the long climb.
The last 7.9 km rise another 222 m to the station above the town, at about 989 m.
The architecture follows the process. Every structure was modelled down to its nozzles, because on a water plant the sections are the design, and the contractor builds exactly what they show.
Beside the plant: the administration, and the staff houses set apart under trees.
Featured projects
Phase 2 of the Semel Water Project: the full design package for the treatment plant, steel mains and six reservoirs, serving nine towns and the west of Duhok.
Floating intake, 260 m floating bridge and pre-sedimentation tank: Phase 1 of the Semel Water Project, on the way to three Guinness World Records.
Intake, low-lift pump station, water treatment plant, high-lift pump station, pipeline and reservoirs.
Extending the floating bridge of the Faida Water Project by 100 metres.
Construction and as-built drawings on Mosul Dam lake: intake, DI 8″ pipeline, two compact units and operator training.
Project videos
What guides us
01
Safety is our utmost commitment, and we take pride in an exemplary record. Through continuous training, our entire staff doesn't just meet safety standards. They consistently exceed your project's requirements.
02
To be an independent leader in the services industry, adding value to our clients' businesses through quality management services, building trust and minimizing risk.
03
A workplace that puts people first, where everyone owns their role and commits to safety excellence. We are available when and where our clients need us, and we execute every job swiftly and efficiently.
04
To be the most productive and efficient service organization. The health and safety of our employees, contractors, clients and communities is crucial to getting there.
Experience
From government water schemes to humanitarian response in refugee and IDP camps.
Design and construction of the Khanke floating water intake, 3,400 m³/h: floating intake, 260 m floating bridge, pipeline and pre-sedimentation tank. In operation.
Duhok Governorate · 4,600,000,000 IQDExtending the floating bridge by 100 m in the Faida Water Project.
Duhok Governorate · 831,600,000 IQDDesign and construction of the Batufa water project, 800 m³/h: intake, low-lift pump station, WTP, high-lift pump station, pipeline and reservoirs.
Duhok Governorate · 5,788,983,500 IQDConstruction and as-built drawings of the Al Resala water project on Mosul Dam lake, 100 m³/h: intake, 7,500 m of DI 8″ pipeline, two compact units and operator training. Six lots: three contracted directly, three as subcontractor.
Ninewa Water DirectorateSupply and distribution of materials and tools in Zummar and Sinjar.
WHHExtension of the water network in Bazilla and Gir Baqol villages, Zummar sub-district.
PWJDrilling one borehole in Alqosh – Dakhan and one in Shekhan – Ras Al Ain.
NCARehabilitation of four boreholes in Gohbel village, Sinjar.
NCADrilling four boreholes and rehabilitating one, with a 6,110 m water supply network in Babere, Khatare and Dokhat villages, Alqosh sub-district, Tel Kef, Nineveh.
NCAStabilizing water supply and sanitation services for refugees, IDPs and residents of Duhok Governorate: supply and delivery of spare parts for the Khrabdem water treatment plant.
GIZDrilling and testing of water boreholes in Sinjar.
NCASupply and delivery of sanitation materials and equipment, Tender No. 91110397.
GIZSupply and delivery of sanitation equipment, Tender No. 91112162.
GIZShelter improvement in Dohola village, Sinone.
Mission EastRehabilitation of one borehole in Zorava village.
Mission EastRehabilitation of three boreholes in Gohbal village, Sinone.
GIZ with Mission EastRehabilitation of one borehole in Gormez village.
GIZ with Mission EastMaintenance and expansion of the Sinone water network.
GIZ with Mission EastSupply and installation of latrines in Sharafadin Camp.
GIZ with Mission EastExtension of the water network in Kheder Khalaf camp.
GIZ with Mission EastNew water extension for Domiz 2 refugee camp: two boreholes and 4,550 m of pipeline.
UNICEFWater network for Bajed Kendal 1 camp.
UNICEF · SubcontractorWater network for Khanke camp.
UNICEF · SubcontractorWater network for Berseve camp, stage 1.
UNICEF · SubcontractorWater network for Bajed Kendal 2 camp.
UNICEF · SubcontractorFive wells in Kasara and a pipe network to Kaberto camp.
SPTwo wells with a pipe network in Sinjar.
SPMaintenance of water and sewage networks in Esian Camp.
SPWater network for Qadia camp.
Directorate of Water, Duhok outskirts · SubcontractorNext stage of the Khanke camp water network: supplying and installing a water tank for every tent.
SubcontractorClients and funders